Atlas Water Management Infrastructure

Senex Energy

We contracted with Senex Energy to construct and install water management infrastructure including brine tank pads, water treatment plant pads, access roads, drainage systems and structures, and a second dam for the facility. 


RSA Contractors built drainage systems and structures including channel drains, culverts, pipes, sumps, a leak detection trench, and brine tank pads of 147m in diameter each. Our dam works included bulk earthworks of 400,000 cubic metres of cut and fill/ in-situ material, access road and ramp construction, level marker installation, and geomembrane liner installation.