Our Projects
Contact the RSA team for a free quote on your next project.
The RSA team have delivered numerous complex, challenging and high-profile projects in regional and remote locations.
At RSA, we believe that our past projects success reflects a unique approach to contracting - which employs a combination of agility, perseverance, creativity and professionalism. With each project, we focus on achieving the most cost-effective, safe and efficient methodology for delivering the project to meet and exceed our client’s brief. To achieve this objective we utilise the latest contracting technology coupled with high-performance equipment, delivering effective solutions to sometimes challenging contracting projects in regional and remote locations.

Latest Projects
List of Services
-
Atlas Water Management Infrastructure Senex EnergyAtlas Water Management Infrastructure
-
Lillyvale Feedlot Laird MorganLillyvale Feedlot
-
Koojan Downs Feeding Facility TattarangKoojan Downs Feeding Facility
-
TSF Embankment Raise Works Round Oak MineralsTSF Embankment Raise Works
-
Opal Creek Feedlot AC Australian Country ChoiceOpal Creek Feedlot
-
Rig Pads and Ponds OriginRig Pads and Ponds
-
Talinga Pond D Origin EnergyTalinga Pond D
-
Baralaba Coal Mine Cockatoo CoalBaralaba Coal Mine
Other Projects
Atlas Water Management Infrastructure
Our business has progressively undertaken a number of development stages at Grassdale Feedlot for Mort & Co. Extension works have included upgrading a portion of the access road, construction of feedlot pens, with associated foundations, construction of a 183ML holding pond, water storage dams, weirs and modification of sediment ponds, drains and drainage lines, concrete structures, over 2 million m3 bulk
earthworks, on-site pavement crushing, cement stabilisation, a grain bunker pad and associated works. Pouring of concrete bunks and aprons was made more efficient with the use of the inhouse on-site mobile batch plant. Our quarry management included the drill and blast of over 400,000 ton of pavement material.
Scotia Central and Flank (CF) Plant Expansion
Santos
Santos Qld Upstream Developments awarded a contract to perform civil and piling works for the Scotia Central and Flank (CF) Gas Plant expansion project to support the Facilities Development Hub Expansion Program at Santos GLNG’s upstream field sites in western Queensland.
The scope of work included earthworks, precast concrete installation, underground services installation, roadworks, drainage, fencing installation, tank secondary containment construction, and site finishing.
Eurombah Creek Bulk Earthworks and Access Roads
Monadelphous for APLNG
A contract was awarded to construct the access road and complete bulk earthworks for APLNG’s Gas Processing Facility (GPF).
- 13.5 kilometres of road construction, bulk earthworks for the road and GPF, over 80kms of electrical, conduits, HDPE stormwater pipe
- 10,135m3 of complex concrete works including 1,354 concrete bored piles and subsequent structures
- Multiple sedimentation ponds including concrete spillways
- Detailed excavation, backfilling and compaction around concrete structures
- Site rehabilitation
- Supply of concrete and quarry materials
Goondicum Project
Goondicum Resources
The project saw the re-establishment of the previously shut down Goondicum ilmenite mine in Central Queensland. The scope of work undertaken included:
- Vegetation clearing of the new mining areas
- Holding and tailing dam construction
- Construction of haul roads
- Mining materials for processing
- Haulage of Ilmenite to Gladstone port
- Processing facility maintenance
- Rehabilitation of old mining areas
Bauhinia Regional Rail, Rolleston
Queensland Rail Network
The contract awarded by Queensland Rail was for the construction of 30kms of track formation including the earthworks and drainage for the line stretching from QR’s Blackwater Coal System to Xstrata’s Rolleston Coal Mine. The project team also managed the testing of materials and coordinated the allocation of materials across the overall site. The project scope of works included:
- Clearing and grubbing
- 1,400,000m³ of bulk earthworks
- Topsoil and grass seeding of batters
- 800,000m³ of cut to controlled fill
- Drainage multi-cell culvert – up to 12 cells