Talinga Pond D

Senex Energy

Origin Energy

Following our successful history working with Origin Energy, a follow-up contract was awarded for the construction of a 790ML brine pond. The pond provides additional brine storage at Origin Energy’s Talinga Water Treatment Facility near Chinchilla. 


The scope of work included bulk earthworks, installation of two-layer HDPE plus Geonet, reinforced concrete, an Interpond Transfer System, pump station and access road.