We contracted with Senex Energy to construct and install water management infrastructure including brine tank pads, water treatment plant pads, access roads, drainage systems and structures, and a second dam for the facility.
RSA Contractors built drainage systems and structures including channel drains, culverts, pipes, sumps, a leak detection trench, and brine tank pads of 147m in diameter each. Our dam works included bulk earthworks of 400,000 cubic metres of cut and fill/ in-situ material, access road and ramp construction, level marker installation, and geomembrane liner installation.